News & Updates
Updates from the Institute
The Biomimicry Institute Unveils 10-Year Strategy
The Biomimicry Institute, a nonprofit organization committed to advancing a Nature Positive, inclusive, and regenerative world inspired and guided by nature’s genius, today announced the launch of its ambitious 10-year strategy at New York Climate…
How Intentionality Drives Our Startup Selection Process
Intentionality breathes life into our Ray of Hope Accelerator’s mission and into our operations. Our mission is to accelerate the growth of nature-inspired startups to scale systemic solutions to the world’s most pressing environmental challenges.
Meet the 2024 Ray of Hope Accelerator Cohort
The Biomimicry Institute announced the 10 startups selected to participate in the transformational Ray of Hope Accelerator. The six-month accelerator is designed to propel nature-inspired startups towards commercialization through robust training, networking, $15,000 in non-dilutive funding…
An Interview with Sudoc, as They Scale Up Nature-Inspired Chemistry
Our Director of Innovation, Jared Yarnall-Schane, sat down with Roger Berry, CEO of Sudoc, and their investors Job Van Schelven of PureTerra and Martijn van Rheenen of Momentum Capital, to learn more about how this…
Upcoming events
Live Conversation with Erin Rovalo and Amanda Sturgeon: Biomimicry, Biophilia, and the Built Environment
We’re excited to continue our Live Monthly Conversation Series with an enlightening discussion featuring Erin Rovalo and Amanda Sturgeon. This session will delve into the synergy between biomimicry, biophilia, and the built environment, exploring how…